The second phase of the project produced the preliminary design of the MOSAR overall system.
Every subpart of MOSAR will be designed so that to comply with the system requirements baseline established in the first phase of the project, and the global coherence were verified during a concurrent engineering design meeting, where the goal was to consolidate all technical choices and to review the Interface Control Document baseline.
The preliminary development and integration plan was developed with the demonstration test plan.
For detailed information on the phases of the project, click the link to jump directly to a phase:
Project Schedule
Phase 1
Phase 2 (you are here)
Phase 3
Phase 4
Phase 5